PHASE 1 OF TREPASSEY CARE HOME HANDED OVER
Published: CC Baseline
May 29th 2018
By Cruden
This £6.5m contract to extend, redevelop and refurbish the care home. is being constructed in a suburban residential location, on a sloping site with limited space and a host of technical and logistics challenges. The existing care home has stayed fully occupied and operational throughout the works.
Residents and staff have now occupied the new building so that Phase 2 of the works can commence, which involves limited demolitions, strip out, remodelling and refurbishment of the decanted former care home building (clearly identifiable in the image) to match the new structures finish. The contract is due for completion in May 2019.